Ayres associates rch project
Ayres Associates:
  • Installed, Labeled and Tested 103 category 6 data cables
  • Designed and installed network data room.
Options in community living rch project

Options in
Community Living

  • Installed, Labeled and Tested 125 category 6 data cables
  • Designed and installed network data room.
Fristam pumps rch project
Fristam Pumps
  • Installed, Labeled and Tested 322 category 6A data cables
  • Designed and installed network data room.
  • Installed, Labeled and Tested 10 twenty four strand single mode back cables
  • Designed and installed 5 secondary network closets.
Hunger task force rch project
Hunger Task Force
  • Installed, Labeled and Tested 142 category 6 data cables
  • Designed and installed network data room.
  • Installed, Labeled and Tested 3 six strand OM3 mode back cables
  • Designed and installed 3 secondary network closets.
Sysco rch project
Sysco
  • Installed, Labeled and Tested 122 category 5e data cables
  • Installed, Labeled and Tested 10 category 6 AP data cables
  • Designed and installed network data room.
CL&D rch project
CL&D
  • Installed, Labeled and Tested one 5 node Cellular Amplification System
  • Installed, Labeled and Tested 159 category 6 data cables
  • Designed and installed network data room.
Norris adolescent center rch project
Norris Adolescent Center
  • Installed, Labeled and Tested 4 twelve strand single mode backbone cables between buildings
  • Installed, Labeled and Tested 1 twenty-four strand single mode backbone cables between buildings
  • Designed and installed 2 secondary network closets.
Schoeneck containers rch project
Schoeneck Containers
  • Installed, Labeled and Tested 108 category 6 data cables
  • Designed and installed network data room
  • Installed, Labeled and Tested 4 six strand OM3 backbone cables between buildings
  • Designed and installed 4 secondary network closets.
Custom service hardware rch project
Custom Service Hardware
  • Installed, Labeled and Tested 256 category 6 data cables
  • Designed and installed network data room
  • Installed, Labeled and Tested 2 six strand OM3 backbone cables between buildings
  • Designed and installed 2 secondary network closets.